Mechanical & Electrical Installation
Established in 1887, William Freer Ltd is a leading “turnkey” provider of Mechanical and Electrical Installation Services, with a broad customer base covering both the Public and Private sectors.
We provide a fully integrated M&E Project Management service, throughout the Midlands with our in house teams of highly skilled and experienced technical staff and engineers.
Backed with our ISO9001 and 14001 accreditations we have a solid reputation for delivering consistently high standards.
Each project is fully managed by a dedicated project manager from estimation through to installation and handover.
Our services include design and consultation, installation, inspection, testing and certification. We install the very latest technologies in heating, cooling and ventilation and provide a complete range of electrical engineering services as well as all additional infrastructure support requirements.
We work on a diverse range of projects from high tech installations to the more delicate specialist needs of classical or listed buildings. Whatever your requirements, our M&E Contracts team will deliver an expert service and total peace of mind.
Quality Installations & On-going Maintenance
Our in-house quality assurance procedures are accredited to ISO 9001 and our environmental accreditation to ISO14001 have been developed by our team to complement the whole end to end service offering within the business; helping us to achieve both first time delivery and outstanding projects which we can be proud of.
Quality and integrity are synonymous with William Freer which is why our commitment to this and health, safety and the environment ensures that all works are carried out to the highest of standards.
Furthermore our ‘complete solution’ service ensures your after-care needs and on-going maintenance requirements can be supported through our in house Maintenance team who can be involved in the early stages of your project to ensure continuity and reliability once the project is complete and your system has been handed over.
Typical Project Milestones & Support
Project Management
Project Meetings
Handover
Ongoing Maintenance
Site Survey
Consultation
Estimation
Pre Commencement Programming Meeting
Scroll down to view a selection of our recent projects
〰️
Scroll down to view a selection of our recent projects 〰️
Heritage Project
APETHORPE PALACE
Installation of cold water booster set to feed 6no direct feed twin immersion unvented water cylinders throughout the building
Installation of first fix hot and cold water services hidden within walls and floors to 10no toilets and 2no kitchens
Final fix of sanitary ware within 10no bathrooms.
Project in Brief:
Route development to satisfy both client, structural engineer and designer requirements
Installation of buried oil tank as to keep aesthetics of the building and surroundings
Installation of oil fired plant room (280kw) including low loss header, zoning, building management system and bespoke flue within period chimney
Installation of heating to 1/3 of the building, all pipework to be hidden and period cast iron radiators installed (approx. 60 radiators)




View Below our latest images of progression now visible onsite at Apethorpe Palace.
More to be released soon.














Follow the latest project updates via our Linkedin page https://www.linkedin.com/company/william-freer-ltd/
Project Case Studies





